Work Zone-Related News - Details
| Date Posted: | 5/6/2009 |
|---|---|
| Description: | This report documents the accelerated bridge reconstruction (ABC) techniques used to remove and replace the 4500 South Bridge on State Route 266 over I-215 in Salt Lake City over a weekend. This successful project led Utah DOT to set a goal of making ABC standard practice for all bridges by 2010. |
| URL: | http://www.ops.fhwa.dot.gov/wz/construction/accelerated/index.htm#ex |
Return to News Listings
