Equipment
| Practice Title | Category | Subcategory | State |
|---|---|---|---|
| Quick Change Moveable Barrier™ | Project Development/Design | Tools and Practice |
Illinois, Indiana |
| Portable Concrete Barrier (K−rail) Connection | Construction/Maintenance Materials, Methods, and Specifications | Construction Methods | California |
| Pocket Size 'Guidelines for Temporary Traffic Control' | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control |
Virginia, Wisconsin |
| Construction Practices to Minimize Motorists' Delays and Inconveniences | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | Illinois |
| Halogen Stop/Slow Paddle | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control |
Michigan, Wisconsin |
| Water Filled Barrier in High Speed Freeway Work Zones | Construction/Maintenance Materials, Methods, and Specifications | Traffic Control | North Carolina |
| 220 MHz Radios for Wireless Communication | ITS and Innovative Technology | Traffic Control | Ohio |
| Automated Machine for Cone Placement and Retrieval | ITS and Innovative Technology | Work Zone Control | California |
| Remotely Operated Autoflagger (Slow/Stop Sign) | ITS and Innovative Technology | Work Zone Control | Minnesota |
| Use of 42' Flexible Cones (a.k.a. 'Grabber Cones') | ITS and Innovative Technology | Work Zone Control | Ohio |
